• All Valve are opened with both lines on running position.
• Close Valve 1 & 2 slowly and remove the plunger by puller and replace the mesh.
• The plunger placed in body by puller and tightened both of the plunger than open Valve no. 1 as marked ...
General Features Operational
• The screen (mesh) to be changed manually, when the other screen is under running.
• Die side and barrel side fitment will be done with your specification on extra / actual cost basis.
• Ceramic heaters are ...
Application:
• Screen changer suitable to all process & master batch plants.
• Filter mesh change easily just changing station.
• Station change 3 to 5 seconds with hydraulic power pack.
• Consistancy in quality to final product...